A Petrochemical Plant Jetty piles were under Cyclic Immersion in sea water which was affecting the load bearing capacity of the Jetty and the strength of the piles was deteriorating day by day.
To address this problem and keep the port working, we retrofitted the jetty piles using Pile jacketing Technique with our Underwater Epoxy Grouting System.
6-8 Months (Including Surface Preparation to Final Grouting process)